I would like to rough in plumbing in my basement for a full bath (toilet, sink, and shower). I live just outside of Chicago so I suspect the plumbing codes are the same as Chicago. Currently in my basement I have two sump pumps and pits, one pump takes care of the drainage around the foundation so I would not touch that one. The second pump pit has a 3" floor drain in the middle of the basement connected to it. My air conditioning condenser is piped to drip into this center drain. This sump pit has a vent pipe that is tied into the existing vent stack that goes out to the roof so I believe I can use this to vent the drains for the new bathroom. Can I install the new pipes and keep a center drain in my basement? If so, what is the best way to tie all of this together? I'm not sure if you can post pics on this forum yet but if a knowledgeable plumber can help me I can show you what I'm looking at doing. I realize I will have to break up the floor in the basment in order to lay the new pipe and I know it's going to be a tough job and a mess but I'm definitely able to do this but I want to make sure I am doing it properly. I also have questions about the pit that my sump pump is in, how can I tell if the pit is an ejector pit and how can I tell if the pump is an ejector pump?
Thanks in advance for the help.