I am building a 40X50 metal building to use as a workshop and storage. I have calculated that I need at least 70 amps so am planning on going with a 100A load center. I will us #12and 20 amp breakers. My question is regarding the wiring. I am assuming I should use conduit instead of running romex. I am in a rural area and there are no codes to be concerned about, but I do want to do what is “smart.” If I use conduit can I use plastic or should I go with metal?