I'm adding a shower to a half bath rough in. When I dug up the concrete to expose about 18" of a 3" PVC drain pipe, I realized I had a problem. How do I attach a wye if the ends I cut have no slack? I've read some about ferncos and couplings, but not sure about burying them underground, etc.
I would think this would be a pretty common situation, but I haven't seen much on here that spells it out.
Thanks for any input.