Unfinished basement rough plumbing.
My home is 3 years old. It is 2 levels with the lower level a walkout basement (half finished and half unfinished). In the unfinished side of the basement I have 2 PVC pipes coming out of the concrete floor 18 inches tall. The pipes are 5 feet apart, one is a 2" and the other is 4" and both are capped with a rubber cap. The 4 inch pipe is identical to the main sewer stack in size and type and the 2 inch pipe is the same as the basin and shower drain pipes. Both pipes are approximately two and a half feet away from where my main sewer line runs north and south which is under the concrete. My main sewer stack runs north-south between the 2 pipes (2' and 4") sticking out of the concrete east and west of the main sewer line. The main sewer stack comes up out of the concrete 5 feet from the 2 pipes. My question is, "What are the 2 pipes" I believe the 4 inch is for a toilet and the 2 inch is for a sink. If I were to finish a bathroom would I have to run a separate vent or would the vent on the main stack suffice.