Hi, I posted a while back about doing a basement bathroom and am about to start the project. I was wondering if there is a rule or code that requires the 4"PVC stack to extend all the way to the joists in the basement before going with a reducing bushing to take off with the vent, OR, can I save some money by reducing to vent just above my waste line which comes in from the side of the stack and enters about three feet below the joists (yes I am only saving about 3 feet of 4" PVC but I am trying to see if I can recycle some of my old stack rather than buying another 10 feet, only to use a foot or two)? Thanks in advance.
Regards,
Steve