Worried about general contracor
	
	
		I have a general contractor remodeling a bathroon in my house. I have 2 questions about the work he is doing. I had a drain stack in a shower wall that we were opening up. The contractor busted up  the slab and routed the stack horizontally about 2 feet over into another wall. He then went straight up but when he got into the attic he connected it back to the original stack going out the roof. From what I read the attic connection is not a big deal bit what about not moving the stack over and just routing it sideways... will this work or did he just take a shortcut?? Also, I have 2 bathrooms back to back and as soon as het began dismantling one bathroom the toilet in the other barely flushed. It needd to be plunged multiple times to get the water down. This happened before he start working with the drain stack. What could have happened? Could he have gotten demo debris in the opne toilet line and it effected the other toilet or perhaps does the missing toilet cause a pressure loss. All other drain seem to be working. Help?. he is about to close everything up. Thanks