I am adding a half bath on the 2nd story. The toilet cannot be vented at the back wall of the toilet due to the roof configuration. Can I put in a wye fitting at the 3 inch waste stack just below the floor joist and run my 2 inch vent about 4 feet horizontally in the joist bay where I can then go vertically and tie into a new 2 inch dry vent. The vent would follow the new wall to the right.