Subfloor/mud base dilemma.
Thanks to all for looking.
I am redoing a master bath. I've removed 4x4 tiles that were set on top of a 1.5 inch mud job. I have several questions about the best way to proceed with prepping for new tile:
1. It seems like the original tiles came off OK but the white thinset is still mostly in place and where its not are several voids showing the old mud base. It seems to me that the old mud base is kind of gritty and easy to chip/break away. I don't know if that's normal or not. Do I need to remove all the white thinset that remains?
2. Do I get off as much loose stuff as possible and then level patch wherever voids are before applying new thinset and tile?
3. Would I be better off breaking up the old floor and screwing down durock or hardibacker to my subfloor (plywood)?
My main concern is the condition of the existing mud job. I just don't know how it will hold up to a new tile application...
Thanks for all your answers in advance.
Neal.