Hello,
After taking up the concrete and relocating the plumbing in my basement bathroom, I am ready to pour new cement. I have a 2" pipe for the shower drain and a 3" for the toilet. Do I cement right up against the pipes or do I need some type of wrapper around the pipe? I sure don't want to have to chip out any more concrete! How do the pro's prepare drain stub up's in a concrete slab?