Originally Posted by
hvac1000
If you get 40 degree weather you better secure all water flow in the system or you might suffer some major water damage. I would start by having some aux heaters available. Electric plugins or other method so you can turn the boiler off during that time. Then make sure the cold water feed to the boiler is off to limit the damage when it warms up and the water starts flowing again in the boiler system piping.
Then it will be a hunt to find any leaks in the system. A hand held communications system works great to allow someone to control the boiler water feed line whils the other person checks for leaks that way if a leak is bound the water flow can be stopped immediately by shutting off the boiler feed. This is how it goes until all leaks are found and repaired. Then normal boiler commissioning is in order to restore the heat.
I have been there many times before with customer units and i do not envy your position with the job you might be facing.
Good luck.