Hi All,
I'm putting up a ceiling in my basement. I need to build down about 5-6 inches (varies a bit due to sag) from the existing 2x8 joists to clear some plumbing. I'll be putting up 1x6 T&G for the ceiling.
I thought I would sister in new 2x8s; in that case they would overlap the existing joists 1.5 to 2.5 inches for nailing. Does this seem like a good approach or are there better ways?
Thanks,
Roy