I have a 70's era 5' American Standard cast iron tub with a right hand drain. While moving the plumbing to the right hand wall, the original installation was with the water supply in the left wall, I discovered that tub is being supported by the front lip and one support foot on the back wall side. The two support feet on the front side of the tub are about 1/2 inch off the subfloor. The back foot is starting to dig into the particle board subfloor. My question, should the original installation have had the subfloor built up underneath the tub so that all the support feet were touching? Would now be the time to jack the tub up and get the subfloor built up to the proper height? I think I can get it in in three 9 inch strips.