Plumbing Issues here in Florida
I am having a master room/master bathroom, walking closet, utility room addition detached from my house.
I hired a plumber to to the roughin drain that did not test his work, how can I do this... I have my construction on hold waiting for a carpenter to bid the frame work.
But my biggest concern is the roughin drain piping before the pouring of the concrete slab.
Do these have to have its vents also now or that is done after all framinh work is done?
He did not attach no vent. He has run a 3" pip thru the footer. It has a 6" pvc pipe around the piping going through the footer with sprayed foam foam in between.
Does it soung right? I need help.
Where do I buy the test ball? And how do I test for my own satisfaction and peace of mind.
Helpppppppp
Thanks...