Originally Posted by
rtw_travel
Normally you just build a temporary 2x4 wall a foot or so inside the existing wall along the whole length of the wall. It has to be tight from floor to ceiling, because the garage will sag down on to it when you take out the outside wall. It does not need to be nailed into either the floor or ceiling - friction fit is fine.
Then replace the outside wall using the inside wall to temporarily hold the weight. When doing this, remove the outside wall slowly one stud at a time to ensure everything is being supported OK... and start rebuilding as you go so that a minimum amount of wall is removed at any one time. If the existing studs are not completely rotten, then cut off the rotten bits near the bottom and sister a new 2x4 beside it from floor to ceiling to carry the weight. (This will hopefully minimize damage to the outside wall finish)