I have an inspector who would like me to install all of the breakers before he sign off my rough electrical. I would have no problem doing so but this panel is live. My question is: a. Is this routine, It seems a potential hazard to me.
b. does the inspector have it out for the builder. This is the 2nd bad call electrically and the 10th mechanically.