Venting a 1/2 bath part II
I've been dragging my feet on this job for fear of screwing up big time, sort of. My original question stands and I'll ask again with more details. The 1/2 bath I'm installing is off the kitchen. The toilet drain/sewer line is 36-44" from the main (cast iron) sewer line. This is the perpindicular measurement. 12-13' down the sewer line is a PVC tie-in into the cast iron. It appears to be vented up at the opposite end, roughly 14-15' from this tie-in. My question is twofold. First, would it be okay to come over the 36-44" and down the 12-13' and hook in to the 1 1/2 PVC that is currently cut into the cast iron. Second, if so, I want to make sure I have the proper rate of decent or angle of my sewer line. Oh, and a third... can I tee together the cold water for the sink with the cold water for the toilet? Ugh... I'd give a blueprint or pictures if I knew how. Thanks for all the help... M