What a mess. Presswood floor in the bathroom got wet. Had to cut it all out and lay down a new floor. Of course that calls for removing the tub.. etc. As you remove a 5' tub from a 5' hole we caused wall damage. VS putting in drywall I would like to put up paneling... but we have angled ceilings going from 8' to 9'... I can't find 9' paneling. If I cut the shortage area, is it better to match at the bottom or the top? Any other suggestions?
Thanks,
