1 Attachment(s)
Basement plumbing hook up
I am installing a bathroom in the basement which has already been roughed in about three years ago. I know that the two PVC pipes are the drain and vent(they are marked), and what the shower drain and toilet drain are but am unsure about my hook up of the vent and drain. I have included a diagram to see if I am on the right track, but I also need to know if I will need some type of pump for the toilet to be pumped into the main stack or if this was likely taken care of during the rough in?
We have a sump pump and septic tank set up if that matters?
Thanks for your help!