I am going to run a submersible pump in a well 600 feet from our cabin. It is going up hill probably 20 feet in slow rise. Would you have a low pressure by only going with 1" instead of 1 1/4" sch 40. Also another question - the existing line is one made of ~2" - ~2 1/2" plastic pipe which they use for water at oil drilling sites. I did not know this. I was thinking about digging down to the pipe from the top part of the attachment and running the new pipe inside of the old pipe. I was going to use bell ended pipe and use the beveled end going down hill so with any bumps it would slide over. The pipe is a single piece. What do you think the chance of running it inside of the other pipe all the way down.