Wiring basement from previous rough in
When we built - 4 years ago, my electrician wired all of the lights in our basement to 2 three way switches. I am currently rewiring to add switches to the newly built walls and rooms. How to I tie into the current and draw it to the separate switches that I am going to use?
My main concern is the hallway: It has a light, and I want to wire that light to two 3-way switches. I am thinking that I need to run a #12-2 from the light to the first switch, then a #14-3 to the next switch and back up to the light. Am I correct in this thinking, or way off. I know that I need to take the black wire off the light and run it to the switch in order to make the switch control that light.
Any info on how to simplify this job would be much appreciated.
Thank you