(I realize this is not exactly a plumbing question, but perhaps someone here has dealt with this issue.)
I'm installing a Kohler Symbio shower receptor (a corner installation). The directions say to shim out the studs next to the receptor one-quarter inch to allow the cement board to overlap the receptor. This sounded fine until I was about to start the construction. Where does the shim end? Do I have to shim out the entire wall, not only to the ceiling, but laterally as well? If not, how do I get rid of the quarter inch difference.
If I had realized this in advance, I would have notched the studs, but the drain is already in place and does not have a quarter inch flexibility.