I'm putting a bathroom in my basement. The plumbing is roughed in. This is the setup:
4 inch stub toilet
3 inch stub (18 inches out of concrete) vent
2 inch stub and approx 12 inches from that is a 12 by 12 covered hole (has a 2 inch capped pipe below the cover) The contractor told me that one is for a shower and the other for a tub. I only want a shower.
Another 2 inch stub (lavoratory?) close to another wall several feet away.
Also there is a stub coming from the floor above (contractor said this was the vent)
My questions are the following:
1. Does the shower stub have a p-trap underneath the concrete?
2. How would you vent this system?
Thanks,
Tom