I have a 1982 double wide cavco that sits above ground. I had a slow drainage problem in the tub and shower. I called the plumber out, actually three of them worked on the issue, and was not resolved. The supervisor explained that after trying for four hours, they were going to call it quits. He also added that my pvc was not up to code and that it should be 2 inch minimum. Is this true or was he fed up with the task. He told me that it was only 1.5 inches and that's why they couldn't get to it. I am disputing the bills that I was handed until I can figure out if my home is in fact plumbed incorectly. I don't know how long the home has been there or who set it up. I have contacted Cavco and they were not too much helpful either... please help... :mad: