I've added new room adjacent to my existing bed room, the old slab was extended about 2' outside the bed room as a shading. The company exposed the steel bars of the shading then bonded new bars and poured new slab integrated with the exposed bars. Is this the better way to do this job, is the new bond will be as it was if the two slabs was poured together or there will be a weak joint between the old and new slabs.