I finished my basement and the home was plumbed for a full batch. I have a 4" pipe coming up through the concrete floor for the toilet. The flooring has been laid up and around the pvc pipe. First, do I need a 4" flange for the toilet? Second, how far down do I cut the pipe coming up through the floor? Does it need to be level with the flooring? Is there an easy tool to use to cut the pipe? Lastly, how do I drill the flange into the concrete floor?
Thank you.