Hi. I am building a new house, slab on grade. I am trying doing a lot of the work myself. I want to install the water lines under the concrete. What I am wondering is: with pex tubing, can I run a line to (example)one faucet, T in a connector, (above grade) and continue on, back under the slab,to the next faucet or fixture, or should they all be separate lines, with a manifold at the main supply?
I hope this does not sound too confusing! Thanks