For a 200 amp 2 family overhead service I am using a primary and a secondary ground. A #6 stranded copper to two ground rods and a #4 stranded copper to the water meter. My question is, do I run the ground wires to the meter bank or to the panels? I believe it is the meter bank but just want to make sure. Thanks for your help.