Installing shower/tub stall on concrete slab
Im finishing my basement, and need to install a shower/tub stall on a concrete slab. This is the exact model I am using: Tub/Showers, Bathtubs & Showers
Instructions for doing this, I find, are for installations over wood subfloors which has some dimensional lee-way with the positioning of the drain. In my case, and source of my confusion, is that my rough-in has a fixed drain pipe which is capped at about 6 inches height from the floor.
Since there is no flexibility with the drain pipe do I need to correlate the framing based upon the position of the drain? And what is the best methodology for doing this so that I don't put any pressure on any fittings by positioning it wrong? Also, what is an appropriate amount of length of the drain to meet the tub/shower stall?
Thanks a lot in advance for the help.