A budget that is based on the actual activity of a period is known as a:
Master budget.
Flexible budget.
Continuous budget.
Static budget.
I am stuck between flexible budget and continuous budget. Which would be the correct answer and why?
![]() |
A budget that is based on the actual activity of a period is known as a:
Master budget.
Flexible budget.
Continuous budget.
Static budget.
I am stuck between flexible budget and continuous budget. Which would be the correct answer and why?
Flexible shows costs at different production levels, master and static are for a single level of volume based on an estimate of the level of production and sales for the coming period