I am replacing an old shower unit. The metal drain pipe sticks up about 2 inches above the concrete slab. The problem is the new shower drain requires about 3 inches below the base to connect. Am I going to have to dig up some of the concrete in order to get the drain to fit, and then cut off the pipe? If so, what is the best way to dig it out?