I am ready to test my CPVC supply lines. Inspector wants 100psi (air) for test pressure. How long should the test last or hold that pressure to be safe and acceptable? Its been sitting for 2-3 hours and it dropped 10psi... possibly cuz' of the heat... Thanks.