  • Jun 1, 2008, 09:33 AM
    kamich70
    New construction- wire run to ceiling light first.
    Hello- I added a 1500 sq ft addition to my second story. I was told the best way to bring the electrical run, is to bring it in through the ceiling fan/light, then to the switch. Each room will have a ceiling light of some sort, and each room will have one receptacle that is switched.
    All other receptacles will be hot.

    How is this accomplished off one run, or do I need two runs??

    Kamich70
  • Jun 1, 2008, 09:48 AM
    Stratmando
    Personally I would run from panel to switchbox(not ceiling box), If this is romex, run from switch box to each fan with 12 or 14-3 to allow separate light and fan control. You can run another 12 or 14-3 to the switched recepticle(s)(black is hot and red is switched.
    Then use 12 or 14-2 to the remaining recepticles, daisey chain.
    Run from Panel to each room Switch box. Good Luck.
  • Jun 1, 2008, 12:06 PM
    stanfortyman
    Quote:

    Originally Posted by kamich70
    How is this accomplished off of one run, or do I need two runs???

    First off, what is a "run"?


    There is no answer to your question. It's simply how each individual prefers to wire, or has to wire depending on the situation.