Ask Me Help Desk

Ask Me Help Desk (https://www.askmehelpdesk.com/forum.php)
-   Mechanical Engineering (https://www.askmehelpdesk.com/forumdisplay.php?f=494)
-   -   Hvac system design for high rise building (https://www.askmehelpdesk.com/showthread.php?t=218549)

  • May 22, 2008, 12:32 AM
    SHAPRE
    hvac system design for high rise building
    do any 1 describe in detail the design & selection of cooling tower;

    que.=cooling tower for a chiller of 750 TR & 1000 TR?
    primary & secondary pump,condenser pump along with pipe sizing method.
    building height=building 1 is 27 floor ( 350 ft)
    2 is 35 floors(420 ft)
    3 is 37 floors(450 ft)
    requirement of expansion tank.

    thanks
  • May 27, 2008, 12:06 AM
    kunalshinde
    Hi I am quite new in this field and need to design a system for packaging chamber where bean (Nuts) need to be stored at 85 deg Celsius and at 50% R.H. for period of 24 hour.
    Right now they have got a fan blowing hot air at 6000L/s with burner of size 2000mJ/hour though a duct and a temperature is monitored through sensor probes within the chamber. The chamber is of size 10m x 3m.
    The main criteria for system is that the nuts/beans need to be stored at 85 deg and 50% R.H.

  • All times are GMT -7. The time now is 05:23 AM.