I want to add another bathroom and want to cut out the cast iron elbow for the existing toilet, so that I can install a WYE, reconnect the existing toilet and run a 4" PVC drain pipe to the new bathroom.
Is it permissible to cut about 3'' or so from the bell nearest to the stack and use a 4 band no hub coupling to connect the PVC to?
http://i79.photobucket.com/albums/j1...Picture004.jpg