I need a 100A subpanel from parallel 100A main panels
I'm planning to install a low voltage driveway snow melt system that will require 70A (240V). I want to run this from a new 100A subpanel in my attached garage. My problem is that my 200A service is split into two 100A main panels. How would I accomplish this? My other option I suppose is to run a new 100A service from the meter, but I would rather not as the disconnect box at the meter is full with two 100A breakers (one for each main panel), and it seems this would require a new meter box (expensive).
TIA,
Doug