Removed old leaker toilet, all tile backer and subfloor. Replaced sub, backer and tile and got fairly close to the flanged, black pvc coming up through. It's slightly higher than the tile, but too big to get a closet flange over it to attach to the subfloor by drilling through tile and backer. Don't really understand how to get around this, and I don't want to cut off the pvc pipe that goes down i9nto the floor.