Originally Posted by Bginr
The toilet's located on the 2nd floor w/ finished ceiling below. The flange measures approx. 2.5 inches from top to bottom. The bottom of the flange, as well as the cast iron pipe leading to the waste pipe, is below the finished floor. Just so you know, I still haven't installed the cement backer or floor tiles yet. The half inch I mentioned in my first post is what will be remaining after I put down both. If I raise the floor the additional half inch, it won't line up with the floor levels at the 2 entry doors. I know it sounds complicated. Please let me know of the options available. Thanks for the quick reply.