I got quotes from a few plumbers on replacing my galvanized iron pipes in my basement to copper. Keep in mind that the water main, and all the pipes connecting the water heater are already copper. As are the pipes that go up to the second floor. So basically I just need the pipes that lead to the first floor kitchen sink, and first floor bathroom changed to copper. How much money do you think that would cost including labor? I'm talking about 30 feet of piping. (also the drain pipe that would probably be changed to PVC)