I have to reconnect an ground floor existing toilet to a new SVP pipe, which means that I have to cut a trench in the original concrete floor in a 1935 house. How deep will I need to put the pipe below the concrete? Will I need to re-enforce the concrete when I fill the trench back in? I am sorry I am a bit of a novice so any help would be greatly appreciated