I have realized that I've done a bone head move. I'm finishing my basement. Did the electrical work. Sheetrocked, one coat of tape and mud and now I'm second guessing myself for not getting a permit for the electrical. Which needs to be inspected before it's covered up. Anyone else had this problem and what happened. I don't want to get an inspection and them tell me I have to tear off the sheetrock. Thanks
Stressed in MN