I have a hot water baseboard that needs replacing(the whole thing).It is a 6 foot section.
What are the steps that have to be done in order to do so. I only can see one shutoff valve before the section. This is down in the basement so I am about 15-20 feet away from the gas boiler.The only shutoff is at the boiler.After I am done do I need to bleed the sysytem?If so how?. Help!!