Basement 1/2 bath install
I would like to add a half bath in my basement. The planned half bath is just below my kitchen sink on the main level and near the first floor laundry as well. My laundry is just off the kitchen but there is crawl space under it.
In the area where I want to put the half bath, there is a 2" PVC drain pipe for my kitchen sink and my laundry tub connected together, that runs into the basement and into the concrete floor, I would guess into the main sewer line. There is a cleanout "Y" in this line near the basement floor.
I have a couple of questions. First, Can I simply connect my sink drain to this cleanout? Second, can I assume that if I bust the floor near this 2" line I will find the main sewer line to connect my toilet to? Third, I cannot find the vents for either my kitchen sink or the laundry tub in the crawl so I'm guessing that it is in the wall behind the kitchen sink and in the wall between the kitchen and laundry, and of course buried behind finished partitions and cabinetry. So given this information, what is best way to vent my new basement toilet and sink? Do I have to run a new vent pipe up through each floor in the house and out the roof? If that is the only way, how in the heck is that done?
First timer here, thanks for reading and any help you can give.