We have a basement bathroom that contained a shower, but would like to replace the shower with a tub since we have sufficient room. The current shower drain is directly in front of a cement pony wall (front to back 4 level split level home) so I'm not sure how we get under the tub to install the drain. How is this normally handled. Do we have to break up the concrete outside the width of the tub to be able to get underneath once the tub is in place?
Thanks!
Vince