Rough Plumbing Layout - Diagram Review
I am in the process of laying out a rough plumbing diagram for a small accessory building.
I have attached a drawing of my proposed design. The structure will be a on a concrete slab.
Plumbing will be for a small bathroom (WC, Shower, and Sink) and a utility sink outside the bathroom on the same wall. There will be one "wet wall" framed with 2x 6 lumber.
My questions:
Is it OK to vent the Shower using the sink standpipe/vent? These fixtures are less than 5 feet from each other.
I am planning for one cleanout outside the structure between the slab and the connection to the septic line. Is this the only cleanout I need? The length of the drain pipe is less than 35 feet.
Is is OK to connect the WC flange and vent stack directly across from one another (ie using a cross tee) or do these need to be offset from one another (either upstream or downstream?
Picture below. Any comments are appreciated. Thanks