1 Attachment(s)
Lower Basement toilet flang
I recently bought this house with unfinished basement. It had a rough in for a basement washroom. I have 2 issue but the first is the toilet flang is approx 1.25" above the basement floor. I will be putting in tiles but this will still leave an inch. What is the maximum I could allow for, or could I cut the bottom of the flang and put a new one on as it looks like it needs it. I think if I cut it however the old flang will still be on the outside of the drain that was roughed in.