Stand alone shower need to know the order in which to finish
I am converting my half in the basement to a full bath. I extended the current platform floor out to fit a stand alone shower and three walls to enclose it. I ran a drain and trap to a few feet into a y connector into the waste pipe. I was just wondering what is the proper way to proceed? I was thinking attach the two side walls and the shower leaving the back open attaching the drain to the shower and then pouring the cement under the shower on to the plywood. Finishing up with the finally back wall being attached. Any suggestions of questions?
-Joe