Hello, I had to replace the subfloor in my bathroom around the toilet not the whole thing just a cut out piece. Do I have to fill the gaps between my butted up pieces? If so with what? Secondly I also have to lay a partial piece of 3/4 on top of my base do I need to lay anything down on top of the base before laying my 3/4 osb. I plan to top all of this off with a 1/4 piece of luan and then use filler before laying my sticky back tile.