Currently my sub panel in the garage is supplied by 10 gage 2 wire with ground from a 30 amp dbl pull breaker in the house. The run is 30' to the 100 amp box in the garage. The garage is a part time workshop with several power tools on at the same time along with 10 4' fluorescent light fixtures and a ele space heater. Is the gage correct?