Basement bathroom rough in
I am in the process of getting our basement developed and have a question with regards to roughing in for a bathroom. We have a heated floor and wish to put our bathroom in a different location than what was originally roughed in for. We have had a couple of plumbers advise us against doing this as we may damage the in floor heating lines as we break the concrete. Our builder told us that the heating line is continuous and that it would not be a good idea to have any joints in that line if we were to break it. We have heard that a home inspector could come in with a thermal heating device to get a better idea as to where the lines are. Is this accurate? Should we just stay with the original location of the proposed bathroom? Thanks