I recently had a contractor "resurface" my old asphalt driveway. At his suggestion, the job did not involve removing/repairing the old driveway -- he just spread a new layer of asphalt over the existing driveway. In a period of less than 10 days, grass started growing through the resurface job. Is this reasonable? What is the problem? How can it be fixed?:(